Appreciated

Revitalisation of an existing building, the structure of which has been largely preserved

Kitchen_Food_15_700pixels

The old building probably served as a barn originally, and both the room layout and the differences in floor height on the ground floor suggest that the building has already undergone renovation. The older part is built of sandstone and has wooden beam ceilings on the upper floor and vaulted ceilings on the lower floor, as well as a coal cellar. The new extension consists of reinforced concrete ceilings and solid, thickly bricked exterior walls. The house had also recently been given a new exterior skin with 20-centimetre-thick insulation and plaster, giving it a good appearance.

When inspecting the load-bearing structure and walls, Löffler Schmeling Architects determined that they would have to intervene more deeply into the building fabric than expected, but that the effort would still be worthwhile. They formulated the goals of the modernisation and conversion accordingly: the building was to be brought up to the latest technical standards and the floor plans redesigned. The aim was to make the rooms more open, brighter and more inviting. Functionality, design and quality were to play a central role in this. In line with sustainable practices, as much of the existing structure as possible was to be used and as little as possible disposed of. The energy concept was to be designed with the future in mind. The renovation work included the demolition of walls and parts of the old floor slab, the redesign of the bathrooms and the wall and floor surfaces. A new staircase and new windows on the ground floor were added. The underfloor heating is operated by an air-to-water heat pump, which draws most of its electricity from a photovoltaic system. The house meets the KfW 55+ energy standard. The planners consistently sought ways to make use of existing materials and repurpose them intelligently. The demolition material from the floor slab was used as filling material for the disused coal cellar. The exposed stone wall was supplemented with stones that had been removed from other parts of the house and then repointed with trass cement. Existing steel beams were upgraded and reinstalled in a new location. The original terrace slabs now serve as the border for the new terrace. The old garage door was repaired and reused. Where possible, new materials were added in their raw state. For example, the new rolled profiles replace the walls on the ground floor. They were simply cleaned and greased to provide simple and effective corrosion protection.  

 www.loeffler-schmeling-architekten.de

Photography Credits:

Löffler Schmeling Architects

(Published in CUBE Stuttgart 03|23)

Nothing found.

Expressiv Stützenfrei

Ein Büroneubau in Marsdorf bietet Kita, Cafeteria und kollaboratives Arbeiten

Clear, Precise, Enduring

A single-family home that strikes a balance between solidity and warmth

Clear Structure in Record Time

A comprehensive secondary school in Velbert harnesses the hillside topography and embraces a cluster design approach

Too Beautiful to Leave

A private sanctuary that offers everything needed for a retreat at home

Nothing found.

House-Murat_int_05_15_700px

Timber House in a Gründerzeit Quarter

An open staircase serves as the focal point of this residential and commercial building, drawing light from the skylight down through to the ground-floor entrance and...

Witnesses to Time

Historic home awakens: heritage preservation meets contemporary design in striking roof renovation

Breathing New Life Into Historic Structures

Converting Open-Plan Office Space into an Adaptive Executive Floor

RH2788-0075_15_700pixel

A Connecting Urban Element

Double sports hall with pergola forms a new ensemble with two schools

BueroVFinal_0008_19_700pixel

Individual & collaborative

Semi-open design unites two office wings divided by a stairwell

HLC_steimle_architects_220417_001_15_700pixels5luWI7VweBwKa

Where Private and Community Spaces Converge

Urban Quarter near the Railway Station – Unified by Ground Floor Connection and Sheltered Courts

201112045_19_700pixel

Exemplary

Seven-Story Office and Commercial Building in Hybrid Timber Construction

ASSFull_0020_15_700pixel

Modern Schools for a Modern Era

Open design, expanded learning possibilities