Modern Rescue Station

Thoughtfully designed building in Unna enables rapid response operations

In emergency response, every second matters. That's why it's essential that operations run smoothly and efficiently from the moment an alert comes in. This demands more than just well-trained personnel—it requires a facility specifically designed and equipped to support emergency operations. Lindner Lohse Architekten BDA, based in Dortmund, recently designed and completed just such a facility in Unna. Built to meet DIN 13049 standards and workplace regulations (ASR), the building comprises a vehicle bay for two units and a combined staff and operational wing.

Located in the "Alte Heide" district north of Unna, this rescue station features two adjacent structures strategically aligned along Hammerstraße to streamline vehicle deployment. The single-story vehicle hall spans 173 m², while the two-story staff wing provides essential facilities. Vehicle traffic flows separately—departures via the courtyard to Hammerstraße, returns through the rear access from the industrial area. The vehicle hall accommodates three spaces, including one equipped with wash facilities. Both structures employ solid construction: the staff wing features reinforced concrete walls clad in clinker brick, while the vehicle hall combines precast concrete elements with a fiber cement panel façade. Quick-opening folding doors line both long sides. The staff wing incorporates aluminum windows and doors throughout. The interior follows a functional two-part layout. Ground level houses showers, changing facilities, and dedicated storage, drying, and disinfection areas for paramedics. The upper level provides rest rooms, administrative offices, and an open-plan lounge with kitchen—designed as a connected living space. Every detail reflects quality craftsmanship: oak industrial parquet flooring, premium tiles, and high-grade shower fixtures create a welcoming refuge for staff working demanding 24-hour shifts. "Both structures connect via a passage, and we've included a jump shaft down to the vehicle bay—because when the alarm sounds, every second counts," notes Sophie Schulte-Filthaut from the design team.

www.lindner-lohse-architekten.de

Photography:
Peter Stockhausen
www.peterstockhausen.de

(Published in CUBE Ruhrgebiet 02|25)

Architecture:

Lindner Lohse Architects
www.lindner-lohse-architekten.de

Electrical installation:

Baumeister Electrical Engineering
www.baumeister-elektro.de

Facade:

Hagemeister
www.hagemeister.de
Bernhard Heckmann
www.heckmann-bau.de

Vehicle Hall Fiber Cement Façade:

Equitone
www.equitone.com
Heisterkamp Roof Construction
www.heisterkamp-dachbau.de

Lighting:

Neko Lighting
www.nekolighting.com
Regiolux
www.regiolux.de
Performance in Lighting
www.performanceinlighting.com

Windows:

Tietmeyer
www.tietmeyer-metelen.de
Schüco
www.schueco.com

Hardware:

FSB
www.fsb.de
Kochs Bauelemente
www.kochs-bauelemente.de

Flooring and Installation:

Agrob Bruchtal
www.agrob-bruchtal.de

Tiles and Natural Stone:

Sascha von Hatzfeld
www.fliesen-vonhatzfeld.de

Heating:

Buderus
www.buderus.de
Barella Building and Energy Technology
www.barella.de

Nothing found.

Historie trifft Kulinarik

Ein besonderer Ort in der Speicherstadt entfaltet eine einzigartige Atmosphäre

Atmosphärischer Monolith mit Annex

Ein Wohnhaus verbindet sich über ein Terrassenplateau zu einem Ensemble

Städtebauliches Quartier

Ein Gebäudeensemble bildet den Auftakt zu einem neuen Quartier in Essen

Ins Heute geholt

Ein Haus aus den 90ern wird durch gezielte Umbaumaßnahmen freundlicher, offener und heller

Nothing found.

2022-02-04-ArchWerk-Phoenixsee-626-web-edited-15-700pixel

House of Health

Light-filled medical centre rises on the shores of Phoenixsee in Dortmund

Custom-Tailored Home

This home was designed with the future in mind—built to adapt as life unfolds.

Back to Normal with the BGH?

Disclosure Obligations: With Data Rooms, or Without?

RAG_05-C-NikolaiBenner_15_700pixel

Innovative Circular House

Thoughtfully Designed – Every Square Meter of World Heritage Is Sacred Ground

Tuev_Nord_Essen_46_b_15_700pixel

Spacious New Construction

The project centered on three core priorities: sustainable construction practices, contemporary workplace design, and state-of-the-art laboratory facilities.

Past & Future

Model project demonstrates how existing sacred architecture can be transformed

print-9435_19_700pixelIqovENvYk0jmK

Inspiring Atmosphere

A New Coworking Space in Essen-Rüttenscheid Celebrates Art

IMG_7178_b_15_700pixel

Thoughtfully Conceived Design

A 1930s settlement house thoughtfully reimagined and expanded