Seamless Integration

A tool manufacturer unites production, administration, and training under one roof

Secotools_Panorama2_19_700px

Where the Rhineland transitions into the Bergisches Land and the Düsseldorf-Wuppertal railway approaches Erkrath, Seco Tools GmbH established its new German headquarters. The Swedish manufacturer of cutting and milling tools for global machinery and automotive production sought to consolidate its two existing city locations into a single, unified headquarters—with room to grow into a future European hub. Hellmeister Architekten from Düsseldorf, long trusted by the corporation, designed a transparent, elegantly articulated building ensemble that seamlessly integrates four distinct operational functions: design, production, training, and administration.

The site, once occupied by the company's production hall and training facility, sits within an industrial zone bordered by railway on one side and woodland on the other. The striking two-storey entrance structure turns away from the tracks toward Mühlenstraße's extension, revealing a transparent main façade framed by a bold white plaster band. Behind it, a double-height public foyer welcomes visitors. A large window beside the reception invites views into the production operations beyond, while a sweeping staircase leads to the upper-floor conference suite. The canteen, also integrated into the main structure, spans two levels and connects to the conference area via a gallery corridor lined with training and seminar rooms. This gallery opens onto a central, L-shaped atrium—the heart of the complex. Surrounding this courtyard, the remaining functional areas fan out in a logical arrangement that establishes clear sightlines between departments and intuitive navigation for staff and visitors alike.

The three-storey administration wing—housing roughly 120 workstations—and the 2,500 m² production hall both embrace this central courtyard, their façades almost entirely glazed. Each area connects seamlessly, both structurally and functionally. The administration is largely organized as open-plan offices with views spanning the atrium on one side and the forest beyond on the other. Twin skylight bands flood the production hall with abundant natural light, while expansive glazing maintains visual connection to the atrium and adjacent work zones. This design strategy directly embodies the company's vision: dissolving the traditional boundary between production and administration into a unified, interconnected workspace.

www.hellmeister-architekten.de

Photography Credits:

Manos Meisen
www.manosmeisen.de

(Published in CUBE Düsseldorf 01|22)

Nothing found.

Ein neues Wir-Gefühl

Ein Verlag in Herne erprobt auf einer Loft-Etage eines Industrie-Altbaus neue Arbeitswelten

Die Marke erlebbar gemacht

Die Hauptzentrale eines Parfümerieunternehmens in Flingern-Nord setzt auf New Work

Nothing found.

Honest and Transparent

The Düsseldorf Chamber of Industry and Commerce has renovated its conference floors and made them more flexible.

Copy-of-Homepage-Main-Page-DSC9206-rheinweiss-dentistry-15-700px

Am I in the right place?

Dental practice reimagined: where clinical precision meets wellness elegance

Monolith with Flowing Forms

Monolith with Curved Forms

A home that masterfully bridges interior and exterior while celebrating refined architectural detail

Sculptural Interplay

A family home where privacy meets panoramic views of the landscape

Residential Company Willstaetterstr 12 2017 13278 Kitchen Work_15_700px

Interim Use in Your Own Style

Distinctive Spaces, Strong Identity: Corporate Design in Three Dimensions

MIMO-Exterior-TM-01_15_700pixel

Minimal Impact – Maximum Output

A prototype integrating a holistic approach to materials, energy, and use

Sustainability Landmark

The Eclipse office tower in Golzheim is reinventing working in high-rise buildings